Red Bank water and sewer rates

Who supplies water to Red Bank houses, what it costs, and how the sewer charge works.

Tennessee American Water

Tennessee American Water residential General Water Service Tariff (effective January 21, 2025), which serves Red Bank: a monthly service charge by meter size plus block rates per 100 gallons, with the PCOP rider (0.97% from June 1, 2026) applied to the total bill

Use a monthPrice per 1,000 gallons
Fixed charge$20.11 a month
0 to 3 thousand gallons$0.51
3 to 48.6 thousand gallons$8.03
48.6 to 374 thousand gallons$5.05
374 to 3740 thousand gallons$3.77
3740 to 11200 thousand gallons$2.88
11200 to more$1.71
Source
The Citico Water Treatment Plant in Chattanooga draws surface water from the Tennessee River.
Testing
In 2025, the water met state and federal drinking water requirements.
Lead
2025 lead testing: 90th percentile below 1 ppb, and 0 of 51 homes sampled above the action level.
Hardness
Hardness averaged 76 ppm (4.4 grains per gallon) in 2025, which the report lists as moderately hard (61 - 120).

Sewer

Hamilton County WWTA bills sewer on metered water use: $20.45 per 1,000 gallons for the first 100,000 gallons a month from October 1, 2026, plus an $8 monthly Private Service Lateral Program fee for gravity-sewer customers. Tennessee American Water customers get a separate sewer invoice from ENCO Utility Service.

Ways to pay less

  • Cut your stormwater fee up to 50%. Single-family lot owners get a 25% credit on the stormwater utility fee for a rain garden and 25% for rainwater harvesting, up to 50% of the fee. How: Submit the credit application to the Red Bank Stormwater Manager.

Dates

WhenWhat
Due date on your sewer billWWTA adds a 10% penalty to past-due sewer bills; payments must be posted by the due date on the bill.

Pay or manage it

Sources

  1. Tennessee American Water tariff TPUC No. 20, effective January 21, 2025 (TPUC Docket 24-00032)
  2. Tennessee American Water riders effective June 1, 2026 (TPUC Docket 26-00002)
  3. Tennessee American Water rate workpapers, February 2025 (TPUC Docket 24-00032)
  4. Tennessee American Water 2025 water quality report, Citico plant
  5. Tennessee American Water 2024 rate petition, corrected page 4
  6. Hamilton County WWTA schedule of wastewater rates, October 1, 2026
  7. Hamilton County WWTA: understanding your sewer bill
  8. City of Red Bank stormwater management
  9. City of Red Bank stormwater user fee credit manual (2023)

Checked October 21, 2026. Every number here comes from the public sources listed, matched by our checker.

Rates change every year; this page shows when it was last checked. Nothing here is legal, tax or insurance advice.